The level of performance proof required of projects can fall on both sides of an optimal “cost – benefit” line for a system. If a project spends too little effort on proving performance then the result will be problems and complaints in production. If a project has overly stringent performance criteria, the result will be high costs and long delivery delays for the project. Continue reading ‘How much should be spent on ensuring system performance?’ »
